MARRIOTT  RESIDENCE INN
17700 COLLINS AVE -SUNNY ISLES BEACH, FL

Project Description: New construction of an 18 story mixed use 194-guestroom hotel.
Number of Rooms: 194
Amenities: Outdoor Pool & Deck, Sundeck, Retail Area, Breakfast Buffet & Bar, Kitchen & Fitness Center
Parking Spaces: 211
Completed Date: November 2017

TIFFANY HOUSE CONDOMINIUM

Project Description: New Construction of a 12 story structure located at Riomar and Birch in Ft. Lauderdale. Number of units: The project contains a total of 129 decorator ready units comprising of 121 - 1 bedroom, 2 bedroom and 3 bedroom apartments plus 7 two story townhouses. 
Parking Spaces: There are 3 levels of parking.
Amenities: Ground level retail space and 2 swimming pools on levels 4 and 8.

SWEETBIRD SOUTH

Project Description: Sweet Bird South. A two-story retail building the first concept design Norwegian & Fora landmark retail building at Miami Design District, with a total 31,178 square feet. at 99 N.E. 39th Street, Miami FL The building highlights high mansards pitched roofs and vertical surfaces with weathered IPE wood cladding from the Brazilian Amazon, and monumental windows with LED lighting frames, making it a spotlight in the upscale setting of the Miami Design District. The retail stores feature double high cathedral like ceilings. The project is considered a landmark at its early completion given the iconic design of the building. The rooftop Garden Roof design is inspired with swirls from radar’s subtropical weather “doppler”, arranged with over 18,000 multi-color plants.
SF: 31,178 SF
Completed Date: October 1, 2017

GRAND FLAMINGO PARKING GARAGE & LANAI DECK

Project Description: New on grade covered parking and lanai deck on the 2nd floor to include new pavers, planters, IPE benches and trellis, frameless glass railing and landscape lighting.  
SF: 84,505 SF
Parking Spaces: 104 covered parking spaces
Completed Date: November, 2017

L'ATELIER

Project Description: Remodel of existing 3 story hotel into 20 story condo tower with 2 level amenity decks, parking and retail stores.
Number of Units: 25
Amenities: Level 2: lower pool deck with cabanas and bike parking. Level 3: lap pool/spa deck with cabanas, hammam & sauna, treatment room, beauty salon, pool bar, library & gym
Parking Spaces: 44
Completed Date: 8/6/18

MONAD TERRACE

Project Description: ground up 365,383 SF 15 story condominium with 46,523 SF of parking garage area at the basement level. Amenity deck on the ground floor, site development, landscape, hardscape and irrigation, etc. 
Number of Units: 59 units
Amenities: 
Parking Spaces: 134
Completed Date: January 2020